Infrastructure Readiness — High-Density Environments
DC-LAP-PROD-01 · Transformer headroom · Rack density · Readiness index · Densification simulator · OT-native
OT-native · Deliverain historian --:--:--
Transformer utilisation
78.4%
avg across 3 transformers
Max rack density now
58 kW
RACK-G2
Rows ready to densify
2
of 7 rows — ROW-D, ROW-A
Max new GPU load
120 kW
before breach at 90%
Transformer loss today
2.10%
threshold: 3.0% · Rule 6a
Rack density map · kW per rack vs physical limit PDU telemetry · SNMP · OPC UA
PDU-1
PDU-2
PDU-3
PDU-4
ROW-A
12 kW
24% cap
15 kW
30% cap
18 kW
36% cap
14 kW
28% cap
ROW-B
38 kW
76% cap
42 kW
84% cap
35 kW
70% cap
40 kW
80% cap
ROW-C
48 kW
80% cap
46 kW
77% cap
50 kW
83% cap
44 kW
73% cap
ROW-D
8 kW
16% cap
10 kW
20% cap
offline
12 kW
24% cap
ROW-E
37 kW
74% cap
41 kW
82% cap
39 kW
78% cap
43 kW
86% cap
ROW-F
44 kW
73% cap
40 kW
67% cap
47 kW
78% cap
42 kW
70% cap
ROW-G
48 kW
80% cap
41 kW
68% cap
36 kW
60% cap
44 kW
73% cap
ROW-H
31 kW
62% cap
29 kW
58% cap
offline
33 kW
66% cap
Reserved / offline
Low (<20 kW)
Standard (20–40 kW)
High density (40–60 kW)
GPU cluster (>60 kW)
Transformer headroom scorecard OT-native · Rule 6a · Historian delta
Transformer A
Rated capacity1250 kVA
Current load1100 kVA
Loss today1.90%
88% utilised
Headroom: 150 kVA  ·  available
Transformer B
Rated capacity1250 kVA
Current load1056 kVA
Loss today2.40%
84% utilised
Headroom: 194 kVA  ·  available
Transformer C (Standby)
Rated capacity1000 kVA
Current load0 kVA
Loss today0.00%
0% utilised
Headroom: 1000 kVA  ·  standby
Per-row readiness index · power · cooling · UPS redundancy
RowPower scoreCoolingUPSCompositeVerdict
ROW-A
High
✓ adequate N+1
85
Ready
ROW-B
Medium
✓ adequate N+1
72
Marginal
ROW-C
Low
⚠ near-limit N
56
Blocked
ROW-D
High
✓ good 2N
92
Ready
ROW-E
Low
✓ adequate N
58
Blocked
ROW-F
Medium
✓ adequate N+1
78
Marginal
ROW-G
Low
⚠ near-limit N
50
Blocked
GPU densification simulator · "can we add a new cluster?"
Target row
New GPU cluster kW/rack 80 kW
Number of racks 4
Transformer loss headroom is factored into the readiness score using Rule 6a from the Deliverain historian — the unique OT-native contribution no DCIM vendor can replicate.
Row selected
New load
Transformer headroom
Power headroom
Cooling margin
UPS redundancy
OT-native · historian delta · Rule 6a 3 transformers monitored Last updated: --:--:--