Deliverain · Data Center Command Center
DC-LAP-PROD-01 · Lapanga Campus · Single pane of glass
Real-time active --:--:--
Total Power Draw
1725 kW
86.2% of capacity
UPS Capacity
2000 kW
86.2% utilised
PUE
1.48
Target ≤ 1.50
Avg Power Factor
0.970
above 0.90 target
Active Alarms
6
2 critical · 3 warning
Coordinations Today
4
182 kWh saved
24-Hour Load Curve · Site Power Draw IEC 104 · OPC UA
2200 kW1650 kW1100 kW550 kW0 kW00:0003:0006:0009:0012:0015:0018:0021:0024:00
Total site kW IT load kW Capacity
Active Alarms 6
Inlet temperature exceeding limit
RACK-C1 · 07:24
Rack power draw at 93.8% capacity
RACK-E2 · 06:49
Load approaching threshold
UPS-A · 07:39
Transformer utilisation above 85%
TX-01 · 07:07
Battery test completed — capacity 94%
UPS-B · 04:49
PDU polling latency elevated
PDU-G1 · 05:49
Power Usage Effectiveness (PUE)
1.48
Industry benchmark
Target ≤ 1.50 · Best-in-class 1.08
1.08 (best)1.48 (now)2.0 (poor)
1310 kW
IT load
415 kW
Facility overhead
Platform Connection Health
Carbon & Sustainability
0.23 kgCO2/kWh
Carbon intensity · India grid average: 0.41 kgCO2/kWh
42 kgCO2 avoided today via coordination
18.7 tCO2
Monthly CO₂
87.4 tCO2
YTD avoided
Renewable energy share
34% renewable target: 40%